PIB Summaries 27 February 2026

  1. Travelling Across the Industrial Corridors of India
  2. Indian Railways–Indian Army “Framework of Cooperation” for Post-Retirement Employment


  • Union Budget 2026–27 announced an Integrated East Coast Industrial Corridor with a strategic node at Durgapur, expanding corridor-led industrialisation under NICDP to strengthen manufacturing competitiveness and export integration.
  • 3,000 crore allocated in Budget Estimates 2026–27 to National Industrial Corridor Development and Implementation Trust (NICDIT), signalling fiscal prioritisation of plug-and-play industrial ecosystems and trunk infrastructure.
  • Across 11 Industrial Corridors, multiple nodes are operational or nearing completion, reflecting acceleration of greenfield industrial cities aligned with PM GatiShakti National Master Plan.

Relevance

GS Paper III – Economy

  • Manufacturing-led growth; target 25% of GDP.
  • Logistics cost reduction (1314% of GDP) via DFCs and multimodal hubs.
  • GVC integration and export competitiveness.
  • Large-scale investment (e.g., DMIC 2.02 lakh crore) and job creation (~9.39 lakh projected).

GS Paper III – Infrastructure

  • Dedicated Freight Corridors; industrial townships (e.g., Dholera SIR).
  • Plug-and-play ecosystems under NICDP and PM GatiShakti.
What are Industrial Corridors?
  • Industrial Corridors are linear economic regions developed along high-capacity transport networks integrating road, rail, ports, and airports, catalysing industrial clustering and agglomeration economies.
  • Combine industrial townships, logistics parks, manufacturing clusters, and planned urban settlements, ensuring synchronised infrastructure provisioning and reduced transaction costs for globally competitive production.
  • Built along trunk infrastructure like Dedicated Freight Corridors (DFCs), enabling efficient freight mobility; India’s logistics cost currently around 13–14% of GDP, higher than global benchmarks.
  • Critical for raising manufacturing share toward 25% of GDP and achieving the $5 trillion economy goal through productivity-led industrial growth.
  • Promote regional balance by integrating hinterland states into Global Value Chains (GVCs), reducing excessive coastal concentration of industry.
  • Strengthen exports via SEZ-linked clusters, multimodal logistics hubs, and regulatory simplification aligned with National Logistics Policy.
  • Enable Low-Carbon Industrialisation through renewable energy integration, water recycling, and Transit-Oriented Development (TOD)-based urban design.
National Industrial Corridor Development Programme (NICDP)
  • NICDP is the umbrella framework guiding development of 11 corridors through Centre–State partnership, ensuring land pooling, trunk infrastructure, and sustainability-based industrial ecosystems.
  • Anchored in PM GatiShakti, ensuring GIS-based infrastructure integration, better project sequencing, and reduced inter-ministerial silos.
  • Incorporates Low-Carbon City (LCC) principles: renewable energy adoption, public transit systems, solid waste recycling, and reduced conventional power dependence.
Institutional Mechanisms
  • National Industrial Corridor Development Corporation Limited (NICDC), incorporated in January 2008, functions as project development and knowledge partner for corridor master planning and investment facilitation.
  • NICDIT, re-designated on 7 December 2016, finances strategic trunk infrastructure; allocated ₹3,000 crore in Budget 2026–27.
  • Special Purpose Vehicles (SPVs) jointly owned by Centre and States operationalise cooperative federalism and decentralised execution.
Delhi–Mumbai Industrial Corridor (DMIC)
  • DMIC spans six states leveraging Western Dedicated Freight Corridor; Dholera Special Investment Region (DSIR) covers 920 sq km, India’s largest greenfield industrial node.
  • 22.54 sq km Activation Area at Dholera nearly complete; trunk infrastructure operational, enabling semiconductor, electronics, and EV manufacturing investments.
  • Phase-I cities allotted 350 industrial plots, attracting ₹2.02 lakh crore investments across EVs, renewables, pharmaceuticals (Economic Survey 2025–26).
  • Shendra-Bidkin Industrial Area (SBIA) has potential to attract ₹67,815 crore and generate over 55,000 jobs, targeting automotive and aerospace sectors.
  • ChennaiBengaluru Industrial Corridor (CBIC) strengthens southern automotive and electronics supply chains across Tamil Nadu, Karnataka, Andhra Pradesh.
  • Vizag–Chennai Industrial Corridor (VCIC) aligns with Act East Policy, promoting port-led development along eastern seaboard.
  • Tumakuru and Krishnapatnam Industrial Areas nearing completion, enhancing logistics efficiency and export-oriented production.
  • AKIC leverages Eastern Dedicated Freight Corridor, integrating northern and eastern states for balanced regional industrial growth.
  • 12 additional projects approved in August 2024 under NICDP at total cost ₹28,602 crore.
  • Cover 25,975 acres, expected to attract ₹1,52,757 crore investment potential and generate 9,39,416 jobs, strengthening labour-intensive manufacturing base.
  • Reduce logistics costs toward single-digit GDP share, enhancing export competitiveness and supply-chain reliability.
  • Nearly 9.39 lakh jobs projected under new projects, aiding demographic dividend absorption and formalisation of manufacturing employment.
  • Enable private investment crowding-in by lowering initial capital risks through pre-developed trunk infrastructure.
  • Industrial development linked to Concurrent List (Entry 33 Trade and Commerce) enabling Centre–State legislative cooperation.
  • SPV-based execution reflects Cooperative Federalism, balancing central financing with state-level land and regulatory control.
  • Incorporate renewable energy, zero-liquid discharge norms, water recycling, and green zoning aligned with Net Zero 2070 commitment.
  • Greenfield expansion risks ecological degradation; strict compliance with Environmental Impact Assessment (EIA) norms essential.
  • High Logistics Cost: India’s logistics cost remains 13–14% of GDP, compared to 8–9% in OECD countries, reducing price competitiveness of corridor-based exports despite DFC and multimodal investments.
  • Investment Realisation Gap: While Phase-I DMIC cities attracted ₹2.02 lakh crore, 12 new projects (2024) project ₹1.52 lakh crore potential; actual grounding depends on global demand cycles and domestic credit conditions.
  • Regional Imbalance: Western corridor nodes like Dholera (920 sq km) progress faster than eastern nodes under AKIC, reflecting persistent regional industrial disparity and uneven private investor preference.
  • Environmental Stress: India extracts nearly 25% of global groundwater; corridor nodes in water-scarce states risk industrial over-extraction without mandatory reuse and zero-liquid discharge enforcement.
  • Urban Governance Deficit: Municipal revenues in India average around 1% of GDP, limiting financial sustainability of newly created industrial townships for long-term infrastructure maintenance and service delivery.
  • Reduce Logistics Cost Below 10% of GDP: Integrate corridors with Dedicated Freight Corridors, National Logistics Policy targets, and operationalise multimodal parks at Dadri and Nangal Chaudhary for freight efficiency gains.
  • Sector–PLI Convergence: Align corridor nodes with PLI sectors (electronics, semiconductors, EVs) to ensure anchor investments, replicating DMIC’s ₹2.02 lakh crore mobilisation model.
  • Water-Smart Industrial Mandates: Enforce Zero Liquid Discharge, 100% treated wastewater reuse, and renewable energy quotas within nodes to align with Net Zero 2070 commitments.
  • Eastern Corridor Incentives: Provide differentiated fiscal and infrastructure incentives for AKIC and Odisha Economic Corridor nodes to correct investment skew and promote balanced regional growth.
  • Outcome-Based Monitoring Framework: Shift evaluation from acreage developed to measurable indicators—actual investment realised, jobs created (target 9.39 lakh), export output generated, audited annually under NICDC supervision.
  • NICDC – 2008 incorporation; NICDIT – 2016 re-designation.
  • 11 Industrial Corridors under NICDP; 12 projects approved (2024) costing ₹28,602 crore.
  • Dholera SIR 920 sq km, India’s largest industrial node under DMIC.
  • Industrial Corridors are central to Indias strategy of manufacturing-led growth. Analyse their role in reducing logistics costs, attracting investment, and integrating India into global value chains. Also examine the challenges limiting their full potential. (250 words)


  • On 26 February 2026, Indian Railways and the Indian Army launched a Framework of Cooperation to institutionalise post-retirement employment pathways for Ex-Servicemen and Ex-Agniveers.
  • The initiative provides horizontal reservation and contractual engagement, aligning with the broader objectives of the Agnipath Scheme (2022) to ensure structured second-career transitions.
  • In 202425 vacancy notifications, 14,788 posts were reserved for Ex-Servicemen, signalling a major public-sector employment push within Railways.

Relevance

GS Paper II – Governance & Social Justice

  • Agnipath Scheme rehabilitation mechanism.
  • Horizontal reservation for Ex-Servicemen and Ex-Agniveers.
  • Inter-ministerial coordination (DefenceRailways).

GS Paper III – Economy & Employment

  • 14,788 posts reserved (202425); public-sector job absorption.
  • Skill utilisation and second-career transition.

GS Paper III – Security

  • Civilmilitary logistics synergy (DFCs, USBRL).
  • Veteran integration as element of long-term strategic stability.
Reservation Architecture
  • 10% horizontal reservation in Level-2/above posts and 20% in Level-1 posts for Ex-Servicemen, embedded within existing Railway recruitment rules.
  • Additional 5% reservation in Level-2/above and 10% in Level-1 posts earmarked specifically for Ex-Agniveers, operationalising rehabilitation under Agnipath policy.
  • Recruitment conducted via Railway Recruitment Boards (RRBs) for Level-2/above and Railway Recruitment Centres (RRCs) for Level-1 through competitive examinations.
  • In 2024–25, 14,788 posts reserved for Ex-Servicemen: 6,485 posts in Level-1 and 8,303 posts in Level-2/above, reflecting structured absorption capacity.
  • Over 5,000 Level-1 posts being processed for contractual hiring of Ex-Servicemen as Pointsmen to address operational vacancies faster.
  • 9 Railway Divisions have signed MoUs with Army organisations to expedite contractual induction pending completion of regular recruitment cycles.
  • Framework institutionalises Centre–Centre coordination between Ministry of Railways and Ministry of Defence, reducing fragmentation in veteran resettlement policies.
  • Creates a structured support mechanism for transitioning personnel, improving awareness of civilian job opportunities and reducing friction in career shifts.
  • Contractual engagement model addresses vacancy backlogs in critical safety categories such as Pointsmen, ensuring operational continuity.
  • Indian Railways is among the largest public employers globally; reserving 14,788 posts in one recruitment cycle strengthens formal employment absorption.
  • Early re-employment of retiring soldiers reduces dependency burden and enhances labour productivity by leveraging trained manpower.
  • Supports demographic dividend by utilising relatively young retirees under Agnipath, who exit service after 4 years with structured skilling.
  • Railways and Army share logistics synergy; projects like Dedicated Freight Corridors (DFCs) enhance strategic troop mobility and equipment transport.
  • Infrastructure such as Udhampur–Srinagar–Baramulla Rail Link (USBRL) strengthens rapid deployment in sensitive border regions.
  • Skill-sharing initiatives through Gati Shakti Vishwavidyalaya promote cross-sector technical capacity building.
  • Absorption Capacity Risk: With Agnipath releasing approximately 75% of each batch after 4 years, long-term absorption pressure may exceed available Railway quotas.
  • Contractual Precarity: Hiring 5,000+ Pointsmen on contract risks employment insecurity unless transitioned to regular posts within defined timelines.
  • Skill Mismatch Concerns: Military skills may not always directly align with railway technical roles; structured reskilling modules required beyond discipline advantage.
  • Reservation Implementation Complexity: Ensuring horizontal reservation does not distort general recruitment balance requires strict roster management and transparency.
  • Inter-Ministerial Coordination Gaps: Sustained collaboration between Defence and Railways depends on institutionalised data-sharing and monitoring frameworks.
  • Create Dedicated Veteran Skill Mapping Portal linking Army exit profiles with Railway job requirements to reduce mismatch and improve placement efficiency.
  • Time-Bound Regularisation Policy ensuring contractual Pointsmen are absorbed through fast-track examinations within defined service duration benchmarks.
  • Expand Reservation Beyond Railways by mandating similar quantified quotas in CPSEs and central ministries to distribute Agniveer absorption load.
  • Establish Annual Outcome Audit measuring number of Ex-Servicemen recruited, retention rates, and vacancy reduction statistics under NIC-style monitoring.
  • Integrated Skilling Certification via Gati Shakti Vishwavidyalaya aligned with Railway Safety Standards to convert military competencies into civilian-recognised qualifications.
  • 20% reservation in Level-1 and 10% in Level-2/above for Ex-Servicemen in Railways.
  • 5% (Level-2/above) and 10% (Level-1) reservation for Ex-Agniveers.
  • 14,788 posts reserved (2024–25); 5,000+ contractual Pointsmen under process.
  • The RailwaysArmy Framework of Cooperation institutionalises post-retirement employment pathways for Ex-Servicemen and Ex-Agniveers. Examine its significance in strengthening social security and administrative coordination. (250 words)

Book a Free Demo Class

February 2026
M T W T F S S
 1
2345678
9101112131415
16171819202122
232425262728  
Categories

Get free Counselling and ₹25,000 Discount

Fill the form – Our experts will call you within 30 mins.